Palamon Court, Rhodaus Town

Location: Canterbury

Work: Independent scaffold inspection in Kent

The project was a 5 storey RC frame and clad construction accommodation building for The Canterbury Christchurch University. Tag safe conducted an independent scaffold inspection on a weekly basis for the main contractor who we now work closely with on new projects. Scaffolds erected were varied including independent scaffolds, cantilevers, fans, loading bays and bridgings to name a few. The perimeter scaffold was a TG20:13 compliant independent scaffold with 3m lift intervals, tied at every lift to the main structure. Loading bays were of a tiered design serving all floors to an engineers designs and calculations.